About the project
Purpose: Office block
Contract Scope: Mechanical services for office fit-out
Size: 240,000sq. ft. over 7 stories
- Client: Tiktok Ireland
- Location: Dublin, Ireland
- Approx Value: N/A
- Main Contractor: Structuretone
- Client: DMG Engineering
Scope of Work:
The TikTok Phase 1 project required a comprehensive mechanical fit-out to ensure efficient heating, cooling, and drainage systems for a large office space. The scope of work included:
Heating and Cooling Systems:
- Supply and installation of full heating and cooling systems.
- Installation of 520 Fan Coil Units (FCUs) distributed across 7 floors.
Drainage:
- Supply and installation of condensate drainage systems for all FCUs.
Key Deliverables:
Heating and Cooling Systems:
- Efficient and effective climate control across all office spaces.
- Installation of pipework to 520 FCUs to ensure optimal heating and cooling performance on all 7 floors.
- Systems designed for energy efficiency and environmental sustainability.
Condensate Drainage:
- Reliable and robust condensate drainage system to support the operation of all FCUs.
- Ensure proper removal of condensate water to prevent water damage within the space.
The TikTok – The Sorting Office project successfully delivered a comprehensive and high-quality mechanical fit-out for a 240,000 sq. ft. office block in Dublin, Ireland. With a focus on efficiency, sustainability, and reliability, the project met the client’s requirements and established a comfortable and functional working environment. The meticulous planning, precise installation, and rigorous testing protocols ensured a successful project execution, highlighting the importance of precision and collaboration in achieving project excellence.