Purpose: Office Accommodation
Contract Scope: Mechanical services for office fit-out
Size:
- 197,000sq. ft. over 11 stories, Split in two.
- ft. retail on ground floor.
- Project: 4 & 5 Park Place
- Location: Hatch Street, Dublin.
- Approx Value: €1.1m.
- Main Contractor: Sisk
- Client: Lynskey Engineering
Scope of Work:
The project encompassed comprehensive mechanical services, with a focus on climate control and efficiency. The scope included:
- Full Shell and Core Works: Complete mechanical services installation for the building’s core and shell, setting a strong foundation for further fit-out stages.
- 2 Chillers: Installation of two chillers to manage the building’s cooling needs.
- 2 x 4 Pipe Multi-Function Heat Pumps: These units provided both heating and cooling capabilities, enhancing the building’s energy efficiency.
- Packaged Plant Room on Roof: A pre-fabricated plant room was installed on the roof to streamline operations and maintenance.
- Full Fit-Out of 500+ FCUs (Fan Coil Units) Cat A: The building was equipped with over 500 FCUs to ensure optimal climate control throughout the office spaces.
Key Deliverables:
The project’s key mechanical deliverables included:
- Gas Pipework: Installation of all necessary gas pipework to support the building’s heating systems.
- 4 Dry Risers: Essential for fire safety, ensuring water can be delivered to any floor.
- Heating and Cooling Pipework throughout the shell and core: Comprehensive installation of all necessary pipework for the building’s heating and cooling needs.
- Radiators installed in common areas: Ensuring adequate heating across the common spaces.
- UFH (Underfloor Heating) Manifolds: Providing efficient and evenly distributed heating.
- HTG (Heating), CHW (Chilled Water), and Condensates to 500+ FCUs: Connecting heating and cooling systems to the FCUs to maintain a comfortable environment. Condensate were provided to allow for safe removal of the FCU condense water.
- 2 Roof AHUs (Air Handling Units) including Runaround Coils:: Installed to manage air quality and ventilation throughout the building. The run around coils were provided to enhance the energy efficiency of the air handling units by recovering waste heat.
Project Goals:
The 4 & 5 Park Place project aimed to deliver a high-quality, efficient mechanical fit-out that ensures:
- Excellent Climate Control: Creating a comfortable working environment through advanced heating and cooling systems.
- Reliable Drainage Systems: Ensuring all drainage systems are robust and efficient.
- Energy Efficiency: Achieving LEED Platinum certification through sustainable practices and energy-efficient systems.
- Functional and Comfortable Workspaces: Providing office accommodation that meets modern standards of comfort and functionality.
Project Execution:
The project was executed with meticulous planning and coordination among all stakeholders. Key strategies included:
- Collaboration with Stakeholders: Liaising with the client and main contractor to ensure alignment on project goals and timelines.
- Use of Advanced Technology: Installation of state-of-the-art mechanical systems to meet the high standards required for LEED Platinum certification.
- Efficient Resource Management: Optimal use of resources to stay within budget and meet the project’s €1.1m valuation.
Conclusion:
The 4 & 5 Park Place project successfully delivered a comprehensive mechanical fit-out for an 11-story office building. With a focus on efficiency, sustainability, and comfort, the project met the client’s expectations and achieved LEED Platinum certification. The high-quality climate control systems and reliable drainage ensured a functional and comfortable working environment for all occupants.
This case study highlights the importance of detailed planning, advanced technology, and stakeholder collaboration in achieving project success in modern office accommodations.